Get a free on-site commercial assessment
Solar and batteries for Northern Rivers businesses, up to 1 MW. Commercial finance through Solaris Finance.
A 6.16 kW Jinko solar system with a Sigenergy hybrid inverter, a Sigenergy battery and a Gateway for home battery backup, for Greg and Jeff in Alstonville.
Our own in-house team designed and installed the system, and connected the home’s existing solar so it keeps working with the new battery.
See if you qualify · Call 0483 903 020
★★★★★ Rated 5.0 from 66 Google reviews · read them on Google · read them on our reviews page

Greg and Jeff already had a solar system. They wanted a battery that suits how they use power, plus new panels, so we designed one system around both: new Jinko panels, a Sigenergy hybrid inverter, a Sigenergy battery and a Gateway, with their existing solar tied in rather than thrown away. They were happy to pose with their new battery on handover day.
As with every job, we did a face-to-face site visit before install day to agree the battery position, check the switchboard and confirm which circuits the battery backs up. The solar and inverter went in first, then the battery once stock arrived, and we handled the grid application, the rebate paperwork, monitoring set-up and the sign-off call.
Because the battery is a stack, adding capacity later is simple. That is why we design systems battery-ready.
1. Free energy assessment from one or two recent power bills, or a quick phone call on 0483 903 020.
2. Custom design sized from the household’s real usage, with the federal Cheaper Home Batteries rebate and solar STCs taken off at point of sale. We handle the paperwork. See your rebates or try the battery rebate calculator.
3. Face-to-face site visit before install day: compliant battery position, switchboard and RCBO check, and agreement on what stays on in a blackout. No surprises on the day.
4. Install, usually one day, by our own electricians. No subcontractors. Then monitoring set-up, grid connection and a sign-off call.

10-year battery, 10-year inverter replacement, 25-year panel performance and our 25-year workmanship warranty on our installation work. Equipment is covered by the manufacturer warranties.
The federal battery rebate steps down on 1 January 2027 and again on 1 July 2027, based on install date. If a battery is on your list, it’s worth getting your assessment done early.
We install across the Northern Rivers, including Alstonville and Wollongbar, solar in Lismore and solar in Ballina. Compare Sigenergy, GoodWe and Sungrow, Solax and Tesla, or see adding a battery to existing solar.
Get a free energy assessment · or call 0483 903 020
Find us on Google Maps to read our reviews, or follow our installs on Facebook and Instagram.
More from Sun Connect Solar: your rebates; battery rebate calculator; customer reviews; FAQ; recent installs: Solar and a 24 kWh Sigenergy battery, Mullumbimby area · 24 kWh Sigenergy battery added to existing solar, Lismore · all recent installs.