Get a free on-site commercial assessment
Solar and batteries for Northern Rivers businesses, up to 1 MW. Commercial finance through Solaris Finance.
A 24.1 kWh Sigenergy battery for a three-phase home in Lismore.
This home already had solar, so this was a battery added to the existing system: no new panels needed. We installed a Sigenergy SigenStor with a three-phase hybrid inverter, all done by our own in-house team.
Get a free energy assessment · Call 0483 903 020
★★★★★ Rated 5.0 from 65 Google reviews · read them on Google · read them on our reviews page

Every battery we design is sized from the household’s real power use, from their bills. When a home already has solar, we check whether the existing panels can cover the day and charge the battery for the night; here they could, so the job was battery only. More on adding a battery to existing solar. This home has three-phase power, so the design uses Sigenergy’s three-phase hybrid inverter, with the inverter and battery modules stacked together in one SigenStor unit.
Sigenergy is our premium battery. Its modules stack, so capacity can be added later without starting again.
The SigenStor stands on the concrete path beside the house, against the painted block wall of the lower level, with weatherboards above. It’s a battery inverter on top of three battery modules.
A steel bollard protects the open side of the unit, the required safety and shutdown signage is mounted beside it, and a matching wall-mounted Sigenergy unit sits alongside, with the cabling run neatly in conduit along the wall. The battery position and switchboard were checked at the face-to-face site visit before install day.



1. Free energy assessment from one or two recent power bills, or a quick phone call on 0483 903 020.
2. Custom design sized from the household’s real usage, with the federal Cheaper Home Batteries rebate (and solar STCs where panels are included) taken off at point of sale. We handle the paperwork.
3. Face-to-face site visit before install day: compliant battery position, switchboard and RCBO check, and agreement on what stays on in a blackout. No surprises on the day.
4. Install, usually one day, by our own electricians. No subcontractors. Then monitoring set-up, grid connection and a sign-off call.
Warranties: 10-year battery, 10-year inverter replacement and our 25-year workmanship warranty on our installation work.
The federal battery rebate steps down on 1 January 2027 and again on 1 July 2027, based on install date. If a battery is on your list, it’s worth getting your assessment done early.
Related guides: Lismore area case study: 20.9 kW Jinko solar and a Sigenergy battery | Bilambil Heights case study: 19 kW solar and a Sigenergy battery
We install solar and batteries in Lismore and up to about 15 km west of town, plus the rest of the Northern Rivers. Compare our battery options: Sigenergy, GoodWe, and Sungrow, Solax and Tesla.
Find us on Google Maps to read our reviews, or follow our installs on Facebook and Instagram.
More from Sun Connect Solar: your rebates; FAQ; recent installs: Solar and a 24 kWh Sigenergy battery, Mullumbimby area · 33 kWh GoodWe battery added to existing solar, Lismore.