Switchboard Upgrades and RCBOs Before Solar or a Battery, Northern Rivers

Sun Connect Solar checks your switchboard on the site visit before every solar or battery install, including whether RCBOs are needed to meet current safety standards, so there are no surprises or extra costs on install day. Our own licensed electricians (NSW electrical contractor licence 343044C) do the upgrade.

Every solar and battery job starts at your switchboard. Here is why we check it on every site visit.

Your switchboard is where solar, a battery and an EV charger all connect to your home. Plenty of Northern Rivers homes still have older boards with no room to spare, old fuses or limited safety switch protection. We find out on the site visit, so there are no surprises or extra costs on install day.

Get a free energy assessment · Call 0483 903 020

★★★★★ Rated 5.0 from 65 Google reviews · read them on Google · read them on our reviews page

RCDs and RCBOs, in plain words

An RCD (safety switch) cuts the power in a fraction of a second if current is leaking somewhere it shouldn’t, such as through a person. An RCBO combines a safety switch and a circuit breaker in one device, protecting a single circuit. If one circuit faults, only that circuit trips, so the rest of the house stays on.

Wondering whether your board is ready for a battery? The is my solar battery-ready? checker asks about your switchboard and tells you what to expect.

What the rules say

The Australian Wiring Rules (AS/NZS 3000) require 30 mA RCD protection on new and altered final subcircuits in homes. If a switchboard is replaced, the circuits need to be brought up to current requirements. Adding solar, a battery or an EV charger means new work on your board, so we make sure what we touch meets today’s standards.

Does my switchboard need upgrading for solar or a battery?

Sometimes, not always. Many Northern Rivers homes can take solar or a battery with a few changes on the board, such as new breakers, isolation and RCBOs. Older boards that are full, still run on fuses or have little safety switch protection usually need more work, and sometimes a new board is the safer and tidier answer. We tell you which on the site visit, before you decide anything.

Read: why one battery quote includes switchboard work

Signs of an old switchboard

  • ceramic or rewireable fuses instead of circuit breakers
  • one safety switch (or none) covering many circuits
  • no spare room for the solar, battery or EV charger breakers
  • a black or brown backing panel on an older board, which may contain asbestos
  • breakers that trip often, buzzing, heat, scorch marks or a burning smell (call an electrician straight away)

What current safety standards need

The Australian Wiring Rules (AS/NZS 3000) need 30 mA safety switch (RCD) protection on new and altered circuits in homes. Solar and a battery add new circuits to your board, so the circuits we work on are brought up to today’s standard. Solar and batteries also need their own isolation and the right labelling on the board.

What we check on the site visit

  • the age and condition of the board, and whether it has fuses or breakers
  • how many circuits have safety switch protection, and whether RCBOs are needed
  • spare space for the solar, battery and any EV charger breakers
  • how blackout backup will be wired, and any circuits you want left off it
  • signs of heat, damage or asbestos in the backing panel
  • where the battery can go in a compliant position near the board

No surprises on install day

Because our own electricians see your switchboard face to face before install day, anything it needs is written into your proposal before you say yes. Install day goes to plan, with no extra costs sprung on you on the day.

Signs your board may need work

  • old ceramic or rewireable fuses
  • few or no safety switches
  • no space left for new circuits
  • scorch marks, a burning smell, buzzing or breakers that trip often
  • an older board with a backing panel that may contain asbestos (we identify it and explain safe options)

If you notice burning smells or scorch marks, call a licensed electrician straight away, whether or not you are getting solar.

Why it matters for solar and batteries

Space and protection. Solar and batteries need their own breakers, isolation and labelling on the board.

Blackout backup. A typical install from us backs up the whole home. Some systems need the board rearranged so backed-up circuits are fed from the battery. If you want some circuits left out, such as an EV charger, that’s set up at the board too. See blackout backup.

EV chargers. A charger needs its own circuit and the right safety switch protection. See home EV chargers.

No surprises on the day

We don’t quote remotely and hope for the best. On the face-to-face site visit before every install, we assess your switchboard, including any RCBO upgrades needed to meet current safety standards. Anything needed goes in your proposal before you say yes, so install day goes to plan.

We also do switchboard upgrades on their own, for homes that aren’t getting solar. More: adding a battery to existing solar, solar repairs and inspections, or solar and battery installation across the Northern Rivers.

Why locals trust us with their switchboard

  • Electricians first, not a sales company. Fully licensed NSW electrical contractor (licence 343044C).
  • A face-to-face site visit before every install: compliant battery position, switchboard and RCBO check, no surprises on the day.
  • Our own in-house team designs every system and does every install. 25 years in solar and large commercial electrical work.
  • No subcontractors. We do the work ourselves, backed by a 25-year workmanship warranty on our installation work.

Switchboard and RCBO FAQs

Do I need a switchboard upgrade for solar or a battery?

Not always. It depends on your board’s age, space and protection. We check it on the site visit and include anything needed in your proposal.

What is the difference between an RCD and an RCBO?

An RCD is a safety switch that cuts power if current leaks. An RCBO combines a safety switch and circuit breaker for a single circuit, so a fault only trips that circuit.

Will I find out about switchboard work before install day?

Yes. We assess your board on the face-to-face site visit before every install and put anything needed in your proposal, so there are no surprises on the day.

My board still has old fuses. Is that a problem?

It is worth upgrading. Old rewireable fuses offer less protection and usually mean limited safety switch coverage. We can upgrade the board with or without solar.

What if my switchboard has asbestos?

Some older boards have backing panels that may contain asbestos. We identify it on the site visit and explain the safe options before any work is done.

How do I know if my switchboard is too old for solar or a battery?

Old fuses, only one safety switch (or none), no spare room on the board, or a black or brown backing panel are the usual signs. We check it face to face on the site visit and tell you what it needs.

Does adding a battery always mean a new switchboard?

No. Many boards only need new breakers, isolation and RCBOs added. A full replacement is only needed when the board is old, full or unsafe, and you will know before install day.

What do you check on my switchboard at the site visit?

The board’s age and condition, fuses or breakers, safety switch coverage and any RCBOs needed, spare space for the new breakers, how blackout backup will be wired, and where the battery can go.

Get your switchboard checked

Leave your details →

We’ll text you within minutes. Or call 0483 903 020.

Find us on Google Maps to read our reviews, or follow our installs on Facebook and Instagram.

Help guides: Why does my RCBO or safety switch keep tripping after a solar or battery install?

Related guides: How to test your safety switches (RCDs) | Single-phase vs three-phase solar and batteries

More from Sun Connect Solar: your rebates; FAQ; recent installs: Solar and a 24 kWh Sigenergy battery, Mullumbimby area · 24 kWh Sigenergy battery added to existing solar, Lismore · 33 kWh GoodWe battery added to existing solar, Lismore.

Switching from a gas cooktop? Our induction cooktop switchboard checker tells you in six taps whether your board needs a new 32 A circuit or an upgrade first, and the guide around it covers the rest of getting off gas.

Planning to go all-electric? The switchboard is step one: our full home electrification guide sets out the order, from the board and the solar to getting off gas, so the board is only done once.

Want to know what this means for your home?

Start with the free tools (no details needed to see a result): solar and battery price calculator, is my solar battery-ready? checker or the 60-second battery quiz.

See all the free calculatorsBook a free 15-minute chat

The chat is with our head electrician, about your power bills and what you want from a system. No obligation and no sales script; the firm price comes after we have seen your bills and your home.