Skip to main content

Case Study: Adding a 16 kWh GoodWe Battery to Existing Solar in the Lismore Area

A 16 kWh GoodWe battery added to an existing solar system at a home in the Lismore area.

This home already had solar on the roof and wanted battery storage and blackout backup without the premium price point, so we fitted a GoodWe hybrid inverter and battery stack outside on a new concrete pad, and upgraded the existing solar to run through it, all done by our own in-house team.

Get a free energy assessment · Call 0483 903 020

★★★★★ Rated 5.0 from 65 Google reviews · read them on Google · read them on our reviews page

GoodWe battery, two modules, installed outside on a concrete pad against a house wall in the Lismore area, added to existing solar by Sun Connect Solar

The system

  • Inverter: GoodWe 9.999 kW hybrid inverter
  • Battery: two GoodWe 8 kWh modules, 16 kWh in total (16.64 kWh installed)
  • Solar: the home’s existing system, upgraded to work with the new hybrid inverter; no new panels needed

What we designed and why

Every battery we design is sized from the household’s real power use, from their bills. This home already had solar, so the job was a battery-only design: a new concrete pad for the battery, the GoodWe hybrid inverter and two battery modules fitted on it, and the existing solar cabling redirected into the new inverter so the home gets solar generation during blackouts as well as overnight battery backup. More on adding a battery to existing solar. GoodWe is our mid-tier option: very high quality at a lower price point than Sigenergy.

Two modules gives a solid-sized battery in one tidy stack, with room to add more later if the household’s needs grow.

The install

The battery stands outside against the house wall on its own purpose-built concrete pad, with the AC isolator mounted on the wall above feeding down through conduit to the unit.

As on every job, the battery position and the switchboard were checked at the face-to-face site visit before install day, and the required safety and shutdown labelling is fitted to the unit.

GoodWe battery from the side showing the two stacked modules and isolator switches, Lismore area, installed by Sun Connect Solar

What it gives the household

  • Battery storage added to solar that was already on the roof, so the existing investment keeps earning its keep
  • Blackout backup, powered by the existing solar as well as the battery
  • Monitoring in the GoodWe app, set up and explained before we leave

How every job like this runs

1. Free energy assessment from one or two recent power bills, or a quick phone call on 0483 903 020.

2. Custom design sized from the household’s real usage, with the federal Cheaper Home Batteries rebate (and solar STCs where panels are included) taken off at point of sale. We handle the paperwork.

3. Face-to-face site visit before install day: compliant battery position, switchboard and RCBO check, and agreement on what stays on in a blackout. No surprises on the day.

4. Install, usually one day, by our own electricians. No subcontractors. Then monitoring set-up, grid connection and a sign-off call.

Warranties: 10-year battery, 10-year inverter replacement and our 25-year workmanship warranty on our installation work.

The federal battery rebate steps down on 1 January 2027 and again on 1 July 2027, based on install date. If a battery is on your list, it’s worth getting your assessment done early.

Related guides: Lismore case study: 33 kWh GoodWe battery added to existing solar | Mullumbimby case study: 16 kWh GoodWe battery added to existing solar

Want a big battery without the premium price point, near Lismore?

We install solar and batteries around Lismore and across the rest of the Northern Rivers. Compare GoodWe with Sigenergy, or see the Sungrow, Solax and Tesla batteries we also install.

Check Your Battery Rebate & 0% Loan

Leave your name and mobile. We’ll text you within minutes to get your rebate and 0% loan worked out.
★★★★★
Rated 5.0 from 65 Google reviews
✓Local electricians, no subcontractors
✓No obligation, takes 30 seconds
✓25-year workmanship warranty

Find us on Google Maps to read our reviews, or follow our installs on Facebook and Instagram.

More from Sun Connect Solar: your rebates; FAQ; recent installs: 33 kWh GoodWe battery added to existing solar, Lismore · 16 kWh GoodWe battery added to existing solar, Mullumbimby.